Connecting a Second Ringer
Warning: Power surges, which can occur during electrical storms, can cause life-threatening electric shocks or damage or destroy the PBX.
• Do not open an already connected PBX during an electrical storm. Also avoid disconnecting and connecting electrical lines during an electrical storm.
Requirements:
• Installation cable (e. g. J-Y(St)Y 2x2x0.6) with the following characteristics:
-At least two wires
-Unscreened; however: screened for unfavourable conditions, for example, near a strong transmitter or an electrical power line
1.Lay the lines.
2.Connect the 2nd Bell/Zweitkl. terminal to the second ringer.
3.Connect the Gnd terminal to the second ringer.
Further steps:
• To finish commissioning, you need to configure the COMmander 2TMS (R) module in the Configuration Manager and set up the corresponding relay.